In short
- Egypt’s median fixed broadband download speed was 107.71 Mbps in Ookla’s September 2026 index, 68th in the world. The median upload was 17.41 Mbps.
- Telecom Egypt (WE) holds 86% of fixed broadband connections and is the only fibre broadband operator, according to Opensignal. Businesses can buy dedicated lines that are not shared with other users.
- 5G launched in June 2025, and all four mobile operators now sell 5G internet that can back up a fixed line.
- Scheduled power cuts ran from July 2023 to 21 July 2024. None have been scheduled since, but supply depends on imported gas and local cuts still happen.
- A UPS keeps an office online through short cuts; longer ones need a generator or a plan to work elsewhere.
How fast is business internet in Egypt
Egypt has the fastest fixed internet in Africa. The National Telecom Regulatory Authority (NTRA) said in October 2026 that Ookla had ranked it first on the continent for the first half of the year, the fifth year running (Arab Finance). Ookla’s Speedtest Global Index for September 2026 puts the median fixed broadband download speed at 107.71 Mbps, 68th of the countries ranked and up from 89.75 Mbps a year earlier. The median mobile download speed was 53.69 Mbps, 77th.
The gains are recent. Average fixed speeds rose from 5.4 Mbps in 2017 to 80.3 Mbps in January 2025, and Cairo was the fastest governorate, followed by Giza and Gharbia (Enterprise, June 2025).
| Indicator | Figure | Period | Source |
|---|---|---|---|
| Median fixed broadband download | 107.71 Mbps, 68th in the world | September 2026 | Ookla |
| Median fixed broadband upload and latency | 17.41 Mbps, 9 ms | September 2026 | Ookla |
| Median mobile download | 53.69 Mbps, 77th in the world | September 2026 | Ookla |
| Median fixed broadband download a year earlier | 89.75 Mbps, 71st | September 2025 | Ookla |
| Active fixed broadband subscriptions | 13.13 million, up 9.11% in a year | May 2026 | MCIT, reported by Ahram Online |
| Telecom Egypt’s share of fixed broadband connections | 86% | 2026 | Opensignal |
Medians describe what users measure across all connections. The figure that matters for an office is the one written into its own line contract. Check the upload speed as closely as the download: at 17.41 Mbps, the national median upload is about a sixth of the download.
Who provides fixed lines and fibre
Telecom Egypt, which trades as WE, dominates fixed broadband. It holds 86% of fixed broadband connections, about 11.1 million, and is the only fibre broadband operator, according to Opensignal (September 2026). Vodafone and Orange run VDSL and rely partly on WE’s network for their broadband products. Fibre now reaches the street cabinets nationwide: that coverage rose from 85% in 2019 to complete coverage by 2025 (Enterprise, June 2025). The MCIT bulletin counted 13.13 million active fixed broadband subscriptions in May 2026 (Ahram Online).
Home packages and business lines are different products. Home users report tighter monthly data quotas, higher fees to upgrade and slower speeds once a cap is reached (Ahram Online, February 2026). A dedicated business line is sold on different terms: Vodafone Egypt describes its dedicated internet access as a direct fibre connection with no sharing of bandwidth.
When you compare offers for an office, ask for these in writing:
- a line for your office alone, with the download and upload speeds stated;
- a fixed public IP address, if your VPN, CRM or cloud accounts allow access by address;
- how quickly faults are fixed, and who you call;
- whether the building already has fibre, or how long a new connection takes.
What 4G and 5G backup can do in 2026
A mobile router keeps an office online when the fixed line fails, and in 2026 it can run on 5G. Fixed wireless over 4G has been sold since 2017, and 5G since Egypt launched it in June 2025 (Egypt Independent). All four operators, WE, Vodafone, Orange and e&, now sell 5G fixed wireless internet (Opensignal).
5G coverage is still patchy. In the second quarter of 2026, Vodafone users with 5G phones spent 46% of their time connected to 5G, e& users 31.4%, Orange users 21% and WE users 19.6%, according to Opensignal. More capacity is coming: in February 2026 the four operators bought 410 MHz of new spectrum for about US$3.5 billion, equal to all the spectrum allocated to them over the previous 30 years (Arab Finance).
Mobile backup reduces risk but does not remove it. Masts need power too: during the 2023 cuts Vodafone Egypt said outages hurt its network and installed generators at its base stations (Daily News Egypt, July 2023). And a fault in the core network can hit fixed and mobile services together. When fire broke out at Telecom Egypt’s Ramses Central exchange in Cairo on 7 July 2025, landline and mobile networks were disrupted across large parts of the country and fixed internet across Greater Cairo; NTRA rerouted fixed traffic through another exchange (Al-Ahram Weekly). Where you can, put the backup on a different operator from the main line.
How Egypt connects to the rest of the world
Egypt sits on the shortest route between the Mediterranean and the Red Sea, and most traffic between Europe and Asia crosses it. NTRA counts more than 17 active and planned submarine cable systems, including SEA-ME-WE 4, 5 and 6, AAE-1, MENA, TE North and 2Africa, the last with a design capacity of 180 Tbps on a 45,000 km loop. The Center for Strategic and International Studies reported in November 2025 that over 90% of communications between Europe and Asia pass through Egypt into Red Sea cables.
The counts differ: CSIS gives 14 active systems, with plans to exceed 21 within three years, while NTRA’s higher figure includes planned systems. Cables land on both coasts, at Port Said, Alexandria, Abu Talat and Sidi Kerir on the Mediterranean and at Suez, Hod El Dars, Zafarana and Ras Ghareb on the Red Sea route, and Telecom Egypt is involved in owning or operating more than 13 of them (CSIS).
The same concentration is a risk. In early 2024 the anchor of a cargo ship hit by a missile cut three systems in the Red Sea, AAE-1, EIG and Seacom, and disrupted roughly a quarter of traffic between Asia and Europe. In September 2025 four more Red Sea cables were cut, degrading connectivity across the Middle East and Asia (CSIS). Before your team goes live, test the links it depends on, such as the VPN to head office, the calling platform and the cloud region your software runs in.
What happened to the power supply in 2023 and 2024
Egypt rationed electricity for a year. In July 2023 the government began load-shedding: rolling two-hour cuts across neighbourhoods nationwide, extended to three hours a day in June 2024 during a heatwave (Ahram Online, 17 July 2024). The three-hour cuts were scheduled between 2pm and 9pm, and many areas reported three to five hours a day (Ahram Online, 25 June 2024).
The government suspended the cuts from 21 July 2024 after importing extra fuel oil and gas. The Prime Minister warned at the time that technical faults, such as a transformer failing in the heat, could still cut power for two or three hours. In September 2024 he declared the crisis over and said there would be no more power cuts (Egypt Independent).
How reliable is the power supply in 2026
There has been no scheduled load-shedding since July 2024, through two record summers. The margin is thin, though: close to half the gas used at peak is now imported (Enterprise).
| Date | What happened | Source |
|---|---|---|
| July 2023 | Load-shedding begins: two-hour rolling cuts nationwide | Ahram Online |
| June 2024 | Cuts extended to three hours a day in a heatwave | Ahram Online |
| 21 July 2024 | Scheduled cuts suspended | Ahram Online |
| September 2024 | The Prime Minister declares the outage crisis over | Egypt Independent |
| 12 August 2025 | Record load of 39,500 MW, carried by the grid | Ahram Online |
| March to April 2026 | Israeli gas exports curtailed during the Iran war; shops told to close at 9pm; daily cuts reported in working-class districts of Cairo and Giza | The National |
| August 2026 | Record load of 40,200 MW; the summer passes without load-shedding | Ahram Online, Enterprise |
| 22 October 2026 | The Cabinet says no return to load-shedding has been decided | Ahram Online |
| November 2026 | Gas to fertiliser and methanol plants cut by 33% as LNG prices rise | Enterprise |
The grid carried a record 39,500 MW on 12 August 2025 (Ahram Online) and 40,200 MW in August 2026 (Ahram Online). Between the two records, the war on Iran disrupted gas supply. Israel curtailed most gas exports to Egypt for several weeks; from late March the government ordered shops, restaurants and malls to close at 9pm, and residents of working-class districts of Cairo and Giza reported daily cuts of often more than two hours (The National, 7 April 2026). The closing-hour rule was later relaxed and then scrapped (Enterprise).
Egypt then got through the summer peak without load-shedding by more than doubling its imports of liquefied natural gas, with some limited interruptions (Enterprise, 30 September 2026). In October the Prime Minister described a scenario in which unaffordable fuel could force cuts of six to eight hours a day; the Cabinet said no return to load-shedding had been decided (Ahram Online, 22 October 2026). In November the government cut gas to fertiliser and methanol plants by 33% as LNG prices rose (Enterprise, 9 November 2026). In past shortages, the government cut gas to heavy industry to keep power stations running.
How to plan backup power for an office
Decide first how long your team must keep working through a cut, then size the backup to match. A UPS bridges short outages and gives people time to save their work. For hours of normal work through a cut, plan on a generator.
- Put the router, the mobile backup router, the network switches and the Wi-Fi on the UPS first. Without them, laptops on battery cannot reach anything online.
- Laptops carry their own batteries; desktop computers and screens need the UPS for every minute.
- Agree what happens when the UPS runs down: who works on mobile data, who goes home and who covers the phones.
- If you need a generator, check whether the building has one or allows one, who supplies fuel, and how quickly it takes the load.
- Test the plan with a planned switch-off before you rely on it.
Phone teams have the least room for error. Our guide to setting up a call center in Egypt covers the telephony and security that a voice team adds, and our page on why teams choose Egypt sets these risks next to the rest of the case.
What we provide in the offices we run
Every office we set up gets a dedicated fibre line, 70 Mbps as standard, with a 4G or 5G mobile backup that takes over if the line fails. It comes with a fixed public IP address, a network socket at every desk and the office network and Wi-Fi. Electricity is included in the monthly fee with no cap.
There is no backup power as standard. As an extra, a UPS keeps computers and the internet running for about one hour in a power cut. If a fire or a long power cut puts the office out of use for several days, we move your team to another office we arrange. Urgent faults are worked on within 15 minutes during the support hours set in your contract. Our page on office IT and internet in Egypt covers the rest.
This guide is general information, not technical or legal advice. It was last reviewed on 14 November 2026 against the sources listed below. Speeds and the power situation change month to month; check the latest figures before you rely on them.
Sources
- Speedtest Global Index: Egypt. Ookla, index for September 2026, read 14 November 2026.
- Egypt tops Africa’s fixed internet speeds for 5th year, wins Ookla award. Arab Finance, 18 October 2026, from an NTRA statement.
- Egypt leads Africa for top internet speed, but trails behind the Gulf. Enterprise, 4 June 2025.
- Egypt mobile subscriptions reach 126.91 mln in May as digital infrastructure expands. Ahram Online, 24 August 2026, from MCIT’s ICT Indicators in Brief, June 2026.
- Egypt at the convergence crossroads and what it means for the mobile market. Opensignal, 9 September 2026.
- 2Africa cable boosts Egypt digital exports amid rising internet cost complaints. Ahram Online, 9 February 2026.
- Dedicated Internet Access. Vodafone Egypt, read 14 November 2026.
- Egypt officially launches 5G, marking a leap towards digital transformation. Egypt Independent, 5 June 2025.
- Egypt launches 2026-2030 telecom spectrum strategy with $3.5B frequency deal. Arab Finance, 8 February 2026.
- Vodafone installs electric generators at its base stations due to frequent power outages. Daily News Egypt, 26 July 2023.
- Massive fire at the Ramses Central. Al-Ahram Weekly, 10 July 2025.
- Submarine cable connectivity in Egypt. National Telecom Regulatory Authority (NTRA), presentation published by BEREC, December 2025.
- The Strategic Future of Subsea Cables: Egypt Case Study. Center for Strategic and International Studies (CSIS), 12 November 2025.
- Egypt to stop load-shedding power cuts on Sunday: PM Madbouly. Ahram Online, 17 July 2024.
- Prolonged power cuts despite scorching heat leave Egyptians exasperated. Ahram Online, 25 June 2024.
- No power cuts in Egypt again: Prime Minister Mostafa Madbouly. Egypt Independent, 20 September 2024.
- Egypt electricity load hits unprecedented record of 39,500 MW amid heatwave. Ahram Online, 13 August 2025.
- Israeli gas exports resume, but Egypt is counting cost of energy crunch fuelled by war. The National, 7 April 2026.
- Egypt electricity grid records unprecedented 40,200 MW peak load amid heatwave. Ahram Online, 12 August 2026.
- Egypt’s summer held because of a bet it made before anyone knew there’d be a war to hedge against. Enterprise, 30 September 2026.
- How Egypt decides who loses power when gas runs short. Enterprise, 30 September 2026.
- Cabinet Media Centre says Madbouly remarks on 6 to 8 hour power cuts taken out of context. Ahram Online, 22 October 2026.
- Gov’t deepens industrial gas rationing, raising curtailments on fertilizer and methanol plants to 33%. Enterprise, 9 November 2026.